
Project · Whangārei
Warren Hay Marine Building
The work
GSL’s work included stormwater design calculations, engineering plans, concrete level design and set-out for the building, services and concrete. The team also assisted with council dealings and final sign-off.
Only information documented on GSL’s existing portfolio has been included here.
← All projects