
Project · Mangawhai
Northlink Close
The work
GSL prepared engineering plans for bulk earthworks, building platforms, roading, stormwater and sewer. A topographical survey of the original ground was used to generate a 3D terrain model. GSL then handled engineering set-out for buildings, earthworks and services during construction.
Only information documented on GSL’s existing portfolio has been included here.
← All projects